The location of the project is very prime location. This is being made a smart city. This township is a project township with a very large area of approximately 700 acres. Where all the necessary things will be available to you like college, school, mall, metro line etc. all are coming in the future. Some things have arrived and some things are going to come in the future. This project is being built between the highway and the railway station, from where the distance of the railway station is around 2.5 kilometers and the distance of the highway is also the same. Metro is also coming here soon!...